Tested fire-rated glazing systemsSurvey, supply and install UK-wideEvidence pack on handover
0800 088 6248
FIRE-GLAZING
Cambridgeshire · PE15

Fire-rated glazing in March

From single fire glass panes to full glazed screens, our March service covers the PE15 district and the rest of Cambridgeshire.

E · EW · EIPE15England

Quote for March

Tell us what you need. We reply with next steps and a guide price.

Typical March fire glazing jobs

Fire glazing work generally falls into three groups: replacing glass in existing fire-rated frames, installing new glazed screens and doors, and fixing defects from inspections. We cover all three in March.

Where existing frames have no traceable evidence, we say so and price the options instead of assuming a rating.

March and nearby towns

Our Cambridgeshire coverage takes in March (PE15) and the neighbouring towns of Wisbech, Ely, Peterborough. Peterborough, around 23 km from March, is the largest town in the same coverage area.

March building types

Retail and leisure units and care homes in March are among the building types we cover.

Which rules apply in England?

England Which rules apply?

Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.

Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.

March questions answered

Do you work on occupied buildings in March?

Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.

Do you carry out fire-rated glazing in March?

Yes. We survey and install in March and across Cambridgeshire, including the PE15 district and nearby Wisbech.

Which rules apply to fire-rated glazing in March?

Building work in March follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.

Services

Fire glazing services in March

Process

How a March job runs

Tell us what you have

Send drawings, a fire risk assessment action or photos of the glass marks.

Measure and check

We measure each opening in March and check what the existing frames can accept.

Quote and evidence

Your quote lists each item with its classification and the evidence it relies on.

Install and hand over

Installation to the system details, then a handover pack with photographs and evidence.

Need fire-rated glazing checked, replaced or installed?

Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.

Call freeGet a quote