Fire-Resistant Glass
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →Looking for insulated fire glass in March? We survey, supply and install tested fire-rated glazing for hotels, industrial units and other buildings in and around March, including the PE15 postcode district.
Tell us what you need. We reply with next steps and a guide price.
Insulated fire glass, classified EI, is glazing that maintains integrity and keeps the temperature rise on the non-fire side within set limits for the rated time. It is usually made of several glass panes bonded with interlayers that foam into an insulating barrier when heated, or with a clear gel that absorbs heat.
Modern EI glass is clear in normal use, with high light transmission at lower ratings.
When heated, the interlayers turn opaque and expand, forming an insulating shield. After a fire the glass will need replacing.
Some EI products are internal only. External use needs a product and edge seal approved for UV and weather.
Survey visits can be arranged anywhere in March, including the PE15 districts, and in nearby Wisbech, Ely, Peterborough. March is about 23 km from Peterborough, the largest town in our Cambridgeshire coverage.
If an existing frame in a March building has no traceable evidence, we say so and price the options rather than guess.
You receive the classification references, glass marks and installation photographs for your fire safety records.
We can phase work in March around residents, staff or pupils, with out-of-hours options.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Sector guides below cover hotels, industrial units and other buildings in March.
Yes. Once the interlayers have reacted, the glass has done its job and must be replaced.
The glazing system kept fire on one side (integrity) and limited the temperature rise on the other side (insulation) for at least 60 minutes in a standard fire test.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Building work in March follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →E and EW glass where flames and hot gases must be stopped.
Learn more →Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →Butt-jointed fire glass walls with minimal frames.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
We measure each opening in March and check what the existing frames can accept.
Your quote lists each item with its classification and the evidence it relies on.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.