Tested fire-rated glazing systemsSurvey, supply and install UK-wideEvidence pack on handover
0800 088 6248
FIRE-GLAZING
Cambridgeshire · PE15

Fire-Rated Glazed Screens across March

Our fire-rated glazed screens service covers March and neighbouring areas such as Wisbech and Ely, with every job built around a tested system.

E 30 – EI 120PE15England

Quote for March

Tell us what you need. We reply with next steps and a guide price.

What our fire-rated glazed screens service includes in March

We design, supply and install fire-rated screens in steel, aluminium, timber and frameless formats, working from the rating and positions on your fire strategy. Every screen is built within the limits of its test or assessment evidence: pane sizes, transom and mullion spacing, glass type and the way it is fixed to the surrounding structure.

  • Fire-stopping at head, jambs and sill to the system details
  • Steel, aluminium, timber or frameless frame systems
  • Integrated fire doors and glazed doorsets
  • Survey and setting-out against the fire strategy drawings

What to check before ordering fire-rated glazed screens in March

Acoustic and security needs

Fire glass can be combined with acoustic or security performance in many systems. We confirm the combined build-up is covered before pricing it.

What the screen is fixed to matters

Test evidence covers the screen's connection to specific supporting constructions, such as masonry, concrete or a tested partition. Fixing into a lightweight wall that is not covered can undermine the rating, so we check the substrate first.

Doors inside a screen

A door in a glazed screen has to be tested in that configuration or covered by a doorset certificate and an assessment for the screen. We specify the door and screen as one system rather than mixing products.

Which rules apply to fire-rated glazed screens in March?

England Which rules apply?

Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.

Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.

In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.

Where we work around March

Survey visits can be arranged anywhere in March, including the PE15 districts, and in nearby Wisbech, Ely, Peterborough. March is about 23 km from Peterborough, the largest town in our Cambridgeshire coverage.

How we work in March

Rated systems, not just rated glass

Every quote in March identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.

Work around occupied buildings

We can phase work in March around residents, staff or pupils, with out-of-hours options.

Fixed written quotes

After survey you get a fixed written quote for the agreed scope, so March budgets are not open-ended.

Sectors we cover in March

Sector guides below cover schools and colleges, blocks of flats and other buildings in March.

FAQs for March

How long does installation take?

Small screens are often fitted in a day once manufactured. Larger runs depend on site access and phasing; we agree a programme with you when we quote.

How large can a fire-rated glazed screen be?

It depends on the system's evidence. Most systems state maximum pane sizes and overall heights; very tall or wide screens may need an assessment from a test body. We confirm the limits during design.

Can you price fire-rated glazed screens in March from photos?

We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.

How quickly can you survey in March?

Survey timing in March depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.

Related

Related services in March

Process

From enquiry to handover in March

Tell us what you have

Send drawings, a fire risk assessment action or photos of the glass marks.

Measure and check

We measure each opening in March and check what the existing frames can accept.

Quote and evidence

Your quote lists each item with its classification and the evidence it relies on.

Fit and record

We install, photograph seals and fixings before closing up, and hand over the schedule.

Need fire-rated glazing checked, replaced or installed?

Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.

Call freeGet a quote