Fire-Rated Curtain Walling
Facade glazing tested for fire where boundaries or compartments demand it.
Learn more →For March buildings, we supply, replace and check fire-rated windows wherever the fire strategy depends on it, working to the tested system rather than the glass alone.
Tell us what you need. We reply with next steps and a guide price.
Most fire-rated windows are fixed lights, because opening windows need the opening sash, hinges and locks to be tested too. We supply and install fixed and, where tested, opening fire-rated windows in steel, aluminium and timber, matched to the surrounding windows where possible.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
You receive the classification references, glass marks and installation photographs for your fire safety records.
If an existing frame in a March building has no traceable evidence, we say so and price the options rather than guess.
Windows used for escape from rooms have their own size and opening rules, and should not be confused with fire-resisting windows.
If a fire-rated window cannot open, ventilation may need another route. We coordinate with the designer.
The closer a wall is to a boundary, the less unprotected area it can have. Fixed windows that meet the wall's full fire-resistance requirement, including insulation where required, are not counted as unprotected area; integrity-only glazing generally still is.
Coverage around March includes the PE15 districts and nearby Wisbech, Ely, Peterborough. March is about 23 km from Peterborough, the largest town in our Cambridgeshire coverage.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Sector guides below cover care homes, offices and other buildings in March.
Usually when a wall is close to a boundary, when a window overlooks a protected escape route, or when part of a building faces another part at close range. Your designer or building control will confirm.
Some can, if the opening version has been tested. Fixed fire-rated windows are more common.
Building work in March follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Facade glazing tested for fire where boundaries or compartments demand it.
Learn more →E and EW glass where flames and hot gases must be stopped.
Learn more →EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Slim steel frames for long spans, high ratings and heavy glass.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We visit March to measure, record existing marks and check the frames and substrate.
You receive a written quote naming the tested system and classification.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.