Fire-Resistant Glass
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →If a building in March needs integrity fire glass, the starting point is the rating its fire strategy requires. We confirm that, survey the openings and quote a tested system to suit.
Tell us what you need. We reply with next steps and a guide price.
We supply and fit integrity glass in screens, doors, vision panels and windows where the fire strategy allows it, and upgrade to EW or EI where it does not. Choosing correctly between E, EW and EI is where most of the cost on a project is decided.
After survey you get a fixed written quote for the agreed scope, so March budgets are not open-ended.
If an existing frame in a March building has no traceable evidence, we say so and price the options rather than guess.
Every quote in March identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
Integrity glass costs a fraction of insulated glass and fits slimmer frames, which is why specifying it correctly matters.
Building guidance restricts how much integrity-only glass can be used on protected escape routes and where it can sit. Check the route before choosing E glass.
Integrity-only glass may be acceptable in some fire-resisting partitions, screens and doors, often at high level, within the limits national guidance sets. Compartment walls normally need insulating (EI) glazing.
Whether the building is in central March or the wider PE15 districts, we can survey and quote. We also cover Wisbech, Ely, Peterborough. Peterborough, around 23 km from March, is the largest town in the same coverage area.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
We can survey and quote for industrial units, public buildings and other building types in March.
Glass that stops flames and hot gases for the rated time but lets heat through. It is classified E.
EW glass also limits heat radiation through the glass, which reduces the risk to people and materials near it.
Survey timing in March depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Replace old Georgian wired glass with modern fire glass.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We visit March to measure, record existing marks and check the frames and substrate.
We set out the system, glass, evidence and programme, with a fixed price.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.