Insulated Fire Glass (EI)
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Looking for fire-rated glass floors in March? We survey, supply and install tested fire-rated glazing for public buildings, industrial units and other buildings in and around March, including the PE15 postcode district.
Tell us what you need. We reply with next steps and a guide price.
A fire-rated glass floor is a walk-on glazed floor panel, set in a tested support frame, that keeps both its load-bearing capacity and its fire resistance for a stated time. Because a floor carries load, its classification also includes R for load-bearing capacity alongside integrity and insulation.
Walk-on glass needs an anti-slip finish; it must be one covered by the system.
A glass floor must carry its design load during the fire period. Only systems tested for both should be used.
Glass floors are made to order with longer lead times; we plan early with your contractor.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Our Cambridgeshire coverage takes in March (PE15) and the neighbouring towns of Wisbech, Ely, Peterborough. March is about 23 km from Peterborough, the largest town in our Cambridgeshire coverage.
We can phase work in March around residents, staff or pupils, with out-of-hours options.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
Every quote in March identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
Fire-rated glass floors applies to many building types in March, including public buildings and industrial units.
Each system sets maximum panel sizes; larger areas are divided by a supporting grid.
Yes, using specialist tested systems that cover load-bearing capacity as well as integrity and insulation.
Survey timing in March depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Slim steel frames for long spans, high ratings and heavy glass.
Learn more →Surveys that identify what fire glazing you have and what needs fixing.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
A survey in March confirms sizes, access, existing evidence and fixing conditions.
Your quote lists each item with its classification and the evidence it relies on.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.