Fanlights, Side Panels & Borrowed Lights
Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →For March buildings, we supply, replace and check timber fire-rated screens wherever the fire strategy depends on it, working to the tested system rather than the glass alone.
Tell us what you need. We reply with next steps and a guide price.
The rating depends on the timber species and density, frame sections, bead profiles, fixings and the glazing seals used in the test. We build timber screens to a tested specification, or to a formal assessment, and finish them without compromising the intumescent details.
If an existing frame in a March building has no traceable evidence, we say so and price the options rather than guess.
Every quote in March identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
We can phase work in March around residents, staff or pupils, with out-of-hours options.
Timber frames need dry conditions on site and acclimatisation before glazing to avoid movement around the glass.
Paint and stain are fine on the timber, but intumescent seals must stay clear of paint. We mask them during finishing.
Heavier insulating glass may need larger sections; we confirm the frame can carry the chosen build-up.
Coverage around March includes the PE15 districts and nearby Wisbech, Ely, Peterborough. March is about 23 km from Peterborough, the largest town in our Cambridgeshire coverage.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Timber fire-rated screens applies to many building types in March, including retail and leisure units and care homes.
Sometimes. If the frame can be shown to be suitable, we can replace non-rated glass and add the correct seals and beads. Where it cannot, replacement is the honest answer.
Dense hardwoods are typical; the exact species depends on the tested specification. We confirm species and density on the drawings.
Survey timing in March depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Building work in March follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
We visit March to measure, record existing marks and check the frames and substrate.
We set out the system, glass, evidence and programme, with a fixed price.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.