Tested fire-rated glazing systemsSurvey, supply and install UK-wideEvidence pack on handover
0800 088 6248
FIRE-GLAZING
Cambridgeshire · PE15

Stair, Lobby & Corridor Glazing for March buildings

For March buildings, we supply, replace and check fire-rated escape route glazing wherever the fire strategy depends on it, working to the tested system rather than the glass alone.

E 30 – EI 60PE15England

Quote for March

Tell us what you need. We reply with next steps and a guide price.

Stair, Lobby & Corridor Glazing in March: what's included

Escape route glazing is fire-rated glass in the walls and doors of protected stairs, lobbies and corridors, the routes people rely on to leave a building safely. It has to hold back fire and smoke for the rated time, and on many routes it has to keep heat away from people passing it as well.

  • Insulating glass where escape routes require it
  • Evidence for the fire safety file
  • Stair enclosure screens
  • Smoke seals and closers on doors

What to check before ordering fire-rated escape route glazing in March

Vision through doors

Corridor subdivision doors and double-swing doors normally need vision panels so people do not collide.

Integrity versus insulation

Building guidance limits the amount and position of integrity-only glass on protected routes because people may need to pass close to it while fire is on the other side. Insulating glass removes most of those limits.

Stair enclosures

Glazing into a protected stair needs particular care; the rules depend on whether the stair is part of a protected shaft and how the building is used.

Which rules apply to fire-rated escape route glazing in March?

England Which rules apply?

Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.

Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.

In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.

Areas we cover around March

Whether the building is in central March or the wider PE15 districts, we can survey and quote. We also cover Wisbech, Ely, Peterborough. March is about 23 km from Peterborough, the largest town in our Cambridgeshire coverage.

How we work in March

Honest about unknowns

If an existing frame in a March building has no traceable evidence, we say so and price the options rather than guess.

Rated systems, not just rated glass

Every quote in March identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.

England rules applied

Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.

Sectors we cover in March

Sector guides below cover blocks of flats, hotels and other buildings in March.

FAQs for March

Can I use glass on a fire escape route?

Yes, if it is fire-rated to the required classification and, for integrity-only glass, within the limits building guidance sets for that position.

Do escape route doors need vision panels?

Doors that subdivide corridors or swing both ways normally do, and the glass must be fire-rated to suit the door.

Which rules apply to fire-rated glazing in March?

Building work in March follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.

Can you price fire-rated escape route glazing in March from photos?

We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.

Related

Related services in March

E 30 – EI 120

Fire-Rated Glazed Screens

Internal glazed screens that keep compartments and corridors protected.

Learn more →
E · EW · EI

Fire Glazing Surveys

Surveys that identify what fire glazing you have and what needs fixing.

Learn more →
Process

What happens next

Share the details

Send the fire strategy extract, inspection report or a few photos of the openings.

Site visit

A survey in March confirms sizes, access, existing evidence and fixing conditions.

Quote and evidence

Your quote lists each item with its classification and the evidence it relies on.

Complete and document

Work is completed to the manufacturer's details and documented for your records.

Need fire-rated glazing checked, replaced or installed?

Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.

Call freeGet a quote