Frameless Fire-Rated Glazing
Butt-jointed fire glass walls with minimal frames.
Learn more →Fire-rated glass partitions in Canary Wharf is usually needed for one of three reasons: new building work, a change to an existing fire-resisting wall, or defects found in an inspection. We handle all three.
Tell us what you need. We reply with next steps and a guide price.
Office fit-outs often only need fire-rated glazing on certain lines, such as corridors that serve as escape routes. We work from your fire strategy to rate only what needs rating, and match the look across the rest of the floor so the design stays consistent.
Our Greater London coverage takes in Canary Wharf (E14, SE16, E3, E1W, E1, SE8) and the neighbouring towns of Bow, Canning Town, Greenwich. Canary Wharf sits within our Greater London coverage, alongside Bow.
Rated partitions need fire-stopping inspected before ceilings close. We plan inspection points into the fit-out programme.
Large glass walls need manifestation so people can see them. Applied film must be compatible with the glass and not cover any marks building control may need to see.
Meeting rooms often need acoustic performance too. Some fire partition systems are tested for both; we confirm the combination.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
We can phase work in Canary Wharf around residents, staff or pupils, with out-of-hours options.
If an existing frame in a Canary Wharf building has no traceable evidence, we say so and price the options rather than guess.
Sector guides below cover healthcare buildings, public buildings and other buildings in Canary Wharf.
Some butt-jointed systems are tested for fire. See our frameless fire-rated glazing service for what is possible.
Only where the fire strategy says the wall is fire-resisting, for example along a protected escape corridor or a compartment line. Many meeting room walls do not need a rating.
Building work in Canary Wharf follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Survey timing in Canary Wharf depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Butt-jointed fire glass walls with minimal frames.
Learn more →Light, modern aluminium framing tested for fire.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
We measure each opening in Canary Wharf and check what the existing frames can accept.
We set out the system, glass, evidence and programme, with a fixed price.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.