Tested fire-rated glazing systemsSurvey, supply and install UK-wideEvidence pack on handover
0800 088 6248
FIRE-GLAZING
Greater London · E14

Fire-Rated Glass Partitions for Canary Wharf buildings

Fire-rated glass partitions in Canary Wharf is usually needed for one of three reasons: new building work, a change to an existing fire-resisting wall, or defects found in an inspection. We handle all three.

E 30 – EI 60E14England

Quote for Canary Wharf

Tell us what you need. We reply with next steps and a guide price.

Fire-Rated Glass Partitions in Canary Wharf: what's included

Office fit-outs often only need fire-rated glazing on certain lines, such as corridors that serve as escape routes. We work from your fire strategy to rate only what needs rating, and match the look across the rest of the floor so the design stays consistent.

  • Coordination with your fit-out contractor
  • Manifestation to the impact and visibility rules
  • Single-glazed and double-glazed rated options where tested
  • Perimeter and ceiling-void fire-stopping

Canary Wharf coverage and nearby towns

Our Greater London coverage takes in Canary Wharf (E14, SE16, E3, E1W, E1, SE8) and the neighbouring towns of Bow, Canning Town, Greenwich. Canary Wharf sits within our Greater London coverage, alongside Bow.

Before you order fire-rated glass partitions: what matters

Fit-out sequencing

Rated partitions need fire-stopping inspected before ceilings close. We plan inspection points into the fit-out programme.

Manifestation

Large glass walls need manifestation so people can see them. Applied film must be compatible with the glass and not cover any marks building control may need to see.

Acoustic privacy

Meeting rooms often need acoustic performance too. Some fire partition systems are tested for both; we confirm the combination.

England regulations that shape the job

England Which rules apply?

Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.

Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.

In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.

What every Canary Wharf quote includes

England rules applied

Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.

Work around occupied buildings

We can phase work in Canary Wharf around residents, staff or pupils, with out-of-hours options.

Honest about unknowns

If an existing frame in a Canary Wharf building has no traceable evidence, we say so and price the options rather than guess.

Sectors we cover in Canary Wharf

Sector guides below cover healthcare buildings, public buildings and other buildings in Canary Wharf.

Questions about fire-rated glass partitions in Canary Wharf

Can fire-rated partitions be frameless?

Some butt-jointed systems are tested for fire. See our frameless fire-rated glazing service for what is possible.

Do office glass partitions need to be fire-rated?

Only where the fire strategy says the wall is fire-resisting, for example along a protected escape corridor or a compartment line. Many meeting room walls do not need a rating.

Which rules apply to fire-rated glazing in Canary Wharf?

Building work in Canary Wharf follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.

How quickly can you survey in Canary Wharf?

Survey timing in Canary Wharf depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.

Related

Related services in Canary Wharf

E 30 – EI 120

Fire-Rated Glazed Screens

Internal glazed screens that keep compartments and corridors protected.

Learn more →
Process

From enquiry to handover in Canary Wharf

Start with the brief

Tell us the rating required, sizes and building type, or ask us to find out.

Measure and check

We measure each opening in Canary Wharf and check what the existing frames can accept.

Written proposal

We set out the system, glass, evidence and programme, with a fixed price.

Complete and document

Work is completed to the manufacturer's details and documented for your records.

Need fire-rated glazing checked, replaced or installed?

Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.

Call freeGet a quote