Fire-Resistant Glass
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →We provide insulated fire glass in Peckham and across Greater London, working from the classification your building needs and handing over the evidence that proves what was fitted.
Tell us what you need. We reply with next steps and a guide price.
EI glass is the choice where people need to pass close to the glass during a fire, where combustible materials sit near it, or where building guidance would otherwise restrict glazing. We supply and fit EI 30 to EI 120 glass in tested frames, internally and externally.
You receive the classification references, glass marks and installation photographs for your fire safety records.
Every quote in Peckham identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
We can phase work in Peckham around residents, staff or pupils, with out-of-hours options.
Insulating fire glass should be stored dry, upright and away from direct sun before fitting.
Each step up in rating adds layers, so EI 120 is far thicker and heavier than EI 30. The frame has to be designed for it.
Some EI products are internal only. External use needs a product and edge seal approved for UV and weather.
Survey visits can be arranged anywhere in Peckham, including the SE15, SE5, SE22, SE14, SE17, SE4 districts, and in nearby Brixton, Greenwich, Catford. Peckham sits within our Greater London coverage, alongside Brixton.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Sector guides below cover public buildings, student accommodation and other buildings in Peckham.
Only products approved for external use, usually in a sealed unit with UV protection.
Yes, in normal conditions. It turns opaque only when heated in a fire.
Survey timing in Peckham depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Building work in Peckham follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →E and EW glass where flames and hot gases must be stopped.
Learn more →Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →Butt-jointed fire glass walls with minimal frames.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
A survey in Peckham confirms sizes, access, existing evidence and fixing conditions.
Your quote lists each item with its classification and the evidence it relies on.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.