Frameless Fire-Rated Glazing
Butt-jointed fire glass walls with minimal frames.
Learn more →Looking for fire-rated glass partitions in Shrewsbury? We survey, supply and install tested fire-rated glazing for care homes, blocks of flats and other buildings in and around Shrewsbury, including the SY1 postcode district.
Tell us what you need. We reply with next steps and a guide price.
Office fit-outs often only need fire-rated glazing on certain lines, such as corridors that serve as escape routes. We work from your fire strategy to rate only what needs rating, and match the look across the rest of the floor so the design stays consistent.
Survey visits can be arranged anywhere in Shrewsbury, including the SY1, SY2, SY3 districts, and in nearby Wellington, Telford, Rhosllannerchrugog. Shrewsbury lies roughly 21 km from Telford, within our Shropshire coverage.
Meeting rooms often need acoustic performance too. Some fire partition systems are tested for both; we confirm the combination.
Rated partitions need fire-stopping inspected before ceilings close. We plan inspection points into the fit-out programme.
Non-rated partitions on the same floor can be matched in profile and finish.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Every quote in Shrewsbury identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
After survey you get a fixed written quote for the agreed scope, so Shrewsbury budgets are not open-ended.
We can phase work in Shrewsbury around residents, staff or pupils, with out-of-hours options.
Sector guides below cover care homes, blocks of flats and other buildings in Shrewsbury.
Only where the fire strategy says the wall is fire-resisting, for example along a protected escape corridor or a compartment line. Many meeting room walls do not need a rating.
Frames may be slightly deeper and glass slightly thicker, but most systems are hard to tell apart from standard partitions.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Survey timing in Shrewsbury depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Butt-jointed fire glass walls with minimal frames.
Learn more →Light, modern aluminium framing tested for fire.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
A survey in Shrewsbury confirms sizes, access, existing evidence and fixing conditions.
We set out the system, glass, evidence and programme, with a fixed price.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.