Fire-Rated Glass Partitions
Office glass partitions where the wall has to be fire-resisting.
Learn more →Looking for frameless fire-rated glazing in Shrewsbury? We survey, supply and install tested fire-rated glazing for care homes, public buildings and other buildings in and around Shrewsbury, including the SY1 postcode district.
Tell us what you need. We reply with next steps and a guide price.
Frameless fire glazing only works within tight, tested limits: specific glass types, joint widths, sealants, channel details and maximum heights. We specify it where the evidence supports your layout, and tell you plainly when a slim framed system is the better route.
Frameless fire glazing is at the top of the price range because of the glass and precision required.
Frameless glass is exposed during the build. We plan protection until other trades finish.
The sealant, joint width and any interlayer in the joint come from the test. Generic silicone in a fire glass joint is not acceptable.
Survey visits can be arranged anywhere in Shrewsbury, including the SY1, SY2, SY3 districts, and in nearby Wellington, Telford, Rhosllannerchrugog. Shrewsbury is about 21 km from Telford, the largest town in our Shropshire coverage.
After survey you get a fixed written quote for the agreed scope, so Shrewsbury budgets are not open-ended.
If an existing frame in a Shrewsbury building has no traceable evidence, we say so and price the options rather than guess.
Every quote in Shrewsbury identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Sector guides below cover care homes, public buildings and other buildings in Shrewsbury.
Yes, typically. It also needs more careful site protection.
Usually through a slim framed door set into the run, chosen so the combination is covered by evidence.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Yes. We survey and install in Shrewsbury and across Shropshire, including the SY1 district and nearby Wellington.
Office glass partitions where the wall has to be fire-resisting.
Learn more →EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
We measure each opening in Shrewsbury and check what the existing frames can accept.
Your quote lists each item with its classification and the evidence it relies on.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.