Fire Glazing Remedial Works
Putting right the defects found in surveys and fire risk assessments.
Learn more →From the CT19 district outwards, we arrange fire glazing surveys for buildings across Folkestone, matching glass, frames and seals to tested evidence rather than guesswork.
Tell us what you need. We reply with next steps and a guide price.
Surveys help building owners, managing agents and those responsible for fire safety understand their compartmentation, prepare for building control scrutiny, and plan remedial budgets. We produce a clear schedule with photographs, priorities and costed remedial options.
We can re-inspect after remedial work and update the schedule.
A visual survey records marks, materials and visible defects. It cannot prove a frame's rating without evidence, so we flag unknowns clearly rather than guessing.
Surveys often follow a fire risk assessment action. We address the specific items raised.
Survey visits can be arranged anywhere in Folkestone, including the CT19, CT20, CT50, CT18 districts, and in nearby Dover, Ashford, Deal. Maidstone, around 50 km from Folkestone, is the largest town in the same coverage area.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
After survey you get a fixed written quote for the agreed scope, so Folkestone budgets are not open-ended.
You receive the classification references, glass marks and installation photographs for your fire safety records.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
We can survey and quote for public buildings, care homes and other building types in Folkestone.
It can confirm what is visible and recorded, and identify defects. Proving a rating may need manufacturer evidence or an assessment from a test body.
Yes. We provide costed remedial options and can carry out the work.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Building work in Folkestone follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Putting right the defects found in surveys and fire risk assessments.
Learn more →Replace old Georgian wired glass with modern fire glass.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We visit Folkestone to measure, record existing marks and check the frames and substrate.
You receive a written quote naming the tested system and classification.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.