Fire Glazing Surveys
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →From the E14 district outwards, we arrange fire glazing remedial works for buildings across Canary Wharf, matching glass, frames and seals to tested evidence rather than guesswork.
Tell us what you need. We reply with next steps and a guide price.
We work from fire risk assessments, fire door inspection reports and our own surveys, pricing each item clearly and completing the work with photographs and a schedule you can file. Where an item cannot be fixed without evidence from a manufacturer or test body, we say so and set out the options.
Cables and pipes through glazed screens and their surrounds must be fire-stopped with products tested for that application.
We plan remedial programmes around residents, pupils or staff, with phasing and clear communication.
Each completed item is photographed and cross-referenced to the original report so the action can be closed.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Coverage around Canary Wharf includes the E14, SE16, E3, E1W, E1, SE8 districts and nearby Bow, Canning Town, Greenwich. Canary Wharf sits within our Greater London coverage, alongside Bow.
Every quote in Canary Wharf identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
We can phase work in Canary Wharf around residents, staff or pupils, with out-of-hours options.
If an existing frame in a Canary Wharf building has no traceable evidence, we say so and price the options rather than guess.
Sector guides below cover retail and leisure units, student accommodation and other buildings in Canary Wharf.
Yes, before and after for every item, plus a completion schedule.
Yes. Send the report and we will price the glazing-related actions item by item.
Building work in Canary Wharf follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Yes. We survey and install in Canary Wharf and across Greater London, including the E14 district and nearby Bow.
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We visit Canary Wharf to measure, record existing marks and check the frames and substrate.
Your quote lists each item with its classification and the evidence it relies on.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.