Fire Glazing Remedial Works
Putting right the defects found in surveys and fire risk assessments.
Learn more →Our fire glazing surveys service covers Canary Wharf and neighbouring areas such as Bow and Canning Town, with every job built around a tested system.
Tell us what you need. We reply with next steps and a guide price.
A fire glazing survey is a non-destructive inspection of the glazed screens, doors, panels and windows in fire-resisting walls, recording what glass and frames are installed, whether they appear consistent with the required rating, and what defects need putting right.
In England, information about fire-resisting glazing forms part of the building's safety information. A survey helps build that record.
Defects are graded so you can fix urgent items first and plan the rest.
We can re-inspect after remedial work and update the schedule.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Our Greater London coverage takes in Canary Wharf (E14, SE16, E3, E1W, E1, SE8) and the neighbouring towns of Bow, Canning Town, Greenwich. We cover Canary Wharf as part of our Greater London coverage.
If an existing frame in a Canary Wharf building has no traceable evidence, we say so and price the options rather than guess.
We can phase work in Canary Wharf around residents, staff or pupils, with out-of-hours options.
You receive the classification references, glass marks and installation photographs for your fire safety records.
Fire glazing surveys applies to many building types in Canary Wharf, including blocks of flats and schools and colleges.
Yes. We provide costed remedial options and can carry out the work.
It can confirm what is visible and recorded, and identify defects. Proving a rating may need manufacturer evidence or an assessment from a test body.
Building work in Canary Wharf follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Yes. We survey and install in Canary Wharf and across Greater London, including the E14 district and nearby Bow.
Putting right the defects found in surveys and fire risk assessments.
Learn more →Replace old Georgian wired glass with modern fire glass.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
We measure each opening in Canary Wharf and check what the existing frames can accept.
Your quote lists each item with its classification and the evidence it relies on.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.