Insulated Fire Glass (EI)
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Our fire-resistant glass service covers Stratford-upon-Avon and neighbouring areas such as Warwick and Royal Leamington Spa, with every job built around a tested system.
Tell us what you need. We reply with next steps and a guide price.
Fire-resistant glass is glazing that has been tested, as part of a complete glazed system, to hold back fire for a set time. It is classified by what it stops: E (integrity) keeps flames and hot gases on the fire side, EW also limits the heat radiated through the glass, and EI (integrity and insulation) also limits the temperature rise on the protected side, so people can pass it more safely.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
Every quote in Stratford-upon-Avon identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
If an existing frame in a Stratford-upon-Avon building has no traceable evidence, we say so and price the options rather than guess.
No. A frame is only rated with the glass types and pane sizes it was tested or assessed with. We check the frame's evidence before quoting, and if the existing frame is unknown we say so and price the options.
Insulating fire glass gets thicker and heavier as the rating rises. Large EI 60 and EI 120 panes often need lifting equipment and a frame designed for the load, which we plan before the delivery date.
Many insulating fire glasses use interlayers that need protecting from UV and moisture, so external positions need a product approved for exterior use, with the right edge seal and glazing system.
Our Warwickshire coverage takes in Stratford-upon-Avon (CV37) and the neighbouring towns of Warwick, Royal Leamington Spa, Kenilworth. Stratford-upon-Avon lies roughly 40 km from Nuneaton, within our Warwickshire coverage.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Fire-resistant glass applies to many building types in Stratford-upon-Avon, including industrial units and care homes.
E is integrity only: it stops flames and hot gases passing for the rated time. EW adds a limit on radiated heat through the glass. EI adds insulation, keeping the unexposed face below set temperature rises so people can pass it safely. The number after the letters is the time in minutes.
Integrity glass can be similar in thickness to standard glass. Insulating glass is laminated from several layers, so it gets markedly thicker and heavier as the rating increases from EI 30 to EI 120.
Building work in Stratford-upon-Avon follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Yes. We survey and install in Stratford-upon-Avon and across Warwickshire, including the CV37 district and nearby Warwick.
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →E and EW glass where flames and hot gases must be stopped.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
We measure each opening in Stratford-upon-Avon and check what the existing frames can accept.
We set out the system, glass, evidence and programme, with a fixed price.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.