Steel Fire-Rated Screens
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →From the CV37 district outwards, we arrange fire-rated glazed screens for buildings across Stratford-upon-Avon, matching glass, frames and seals to tested evidence rather than guesswork.
Tell us what you need. We reply with next steps and a guide price.
We design, supply and install fire-rated screens in steel, aluminium, timber and frameless formats, working from the rating and positions on your fire strategy. Every screen is built within the limits of its test or assessment evidence: pane sizes, transom and mullion spacing, glass type and the way it is fixed to the surrounding structure.
New screens, and changes to existing fire-resisting walls, are normally building work. We provide the product evidence your building control body or approved inspector will ask for.
Long screens under slabs need deflection heads so floor movement does not crack the glass or open gaps. The head detail has to come from the same evidence as the rest of the screen.
Building guidance limits where integrity-only glazing can sit on protected escape routes, and in some positions restricts it to above a set height from the floor. Insulating screens are not restricted in the same way, so the route plan often decides the glass.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Coverage around Stratford-upon-Avon includes the CV37 districts and nearby Warwick, Royal Leamington Spa, Kenilworth. Nuneaton, around 40 km from Stratford-upon-Avon, is the largest town in the same coverage area.
If an existing frame in a Stratford-upon-Avon building has no traceable evidence, we say so and price the options rather than guess.
You receive the classification references, glass marks and installation photographs for your fire safety records.
Every quote in Stratford-upon-Avon identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
Fire-rated glazed screens applies to many building types in Stratford-upon-Avon, including offices and retail and leisure units.
Yes. We plan dust control, out-of-hours working and temporary protection so the building can stay in use where the fire strategy allows.
It depends on the system's evidence. Most systems state maximum pane sizes and overall heights; very tall or wide screens may need an assessment from a test body. We confirm the limits during design.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
Yes. We survey and install in Stratford-upon-Avon and across Warwickshire, including the CV37 district and nearby Warwick.
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →Light, modern aluminium framing tested for fire.
Learn more →Hardwood screens and borrowed lights tested for fire.
Learn more →Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
We measure each opening in Stratford-upon-Avon and check what the existing frames can accept.
You receive a written quote naming the tested system and classification.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.