Insulated Fire Glass (EI)
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →When a fire strategy, inspection report or building control comment in Mitcham calls for glazing tested to resist fire, our fire-resistant glass service covers survey, supply and installation.
Tell us what you need. We reply with next steps and a guide price.
We supply and fit fire-resistant glass into new and existing fire-rated frames, matching the glass type, thickness, beads, seals and fixings to the test or assessment evidence for that frame. The glass on its own does not carry a rating; the combination does, so we start every job by identifying the system you have or need.
Coverage around Mitcham includes the CR4, SM4, SW19, SW17, SW16, SM5 districts and nearby Morden, Wimbledon, Streatham. Mitcham is one of the Greater London districts we cover.
Glass in doors, side panels and low-level positions has to meet impact safety rules as well as the fire rating. Most modern fire glass carries an impact classification; old wired glass usually does not.
The fire strategy or building control drawings set the rating for each element. Integrity-only glass is cheaper and thinner, but its use on escape routes is restricted; insulating glass carries far fewer restrictions because people can pass it safely during a fire.
No. A frame is only rated with the glass types and pane sizes it was tested or assessed with. We check the frame's evidence before quoting, and if the existing frame is unknown we say so and price the options.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
We can phase work in Mitcham around residents, staff or pupils, with out-of-hours options.
After survey you get a fixed written quote for the agreed scope, so Mitcham budgets are not open-ended.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
We can survey and quote for healthcare buildings, offices and other building types in Mitcham.
Ordinary toughened safety glass is not. It can shatter early in a fire. Fire-resistant integrity glass is specially processed or formulated and only gains a rating when fitted in a tested frame and glazing system.
Our service is supply and installation, because the rating depends on how the glass is fitted. For trade buyers we can quote supply of cut-to-size panes with the matching glazing materials on request.
Survey timing in Mitcham depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →E and EW glass where flames and hot gases must be stopped.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
A survey in Mitcham confirms sizes, access, existing evidence and fixing conditions.
You receive a written quote naming the tested system and classification.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.