Insulated Fire Glass (EI)
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →For Wallington buildings, we supply, replace and check fire-resistant glass wherever the fire strategy depends on it, working to the tested system rather than the glass alone.
Tell us what you need. We reply with next steps and a guide price.
We supply and fit fire-resistant glass into new and existing fire-rated frames, matching the glass type, thickness, beads, seals and fixings to the test or assessment evidence for that frame. The glass on its own does not carry a rating; the combination does, so we start every job by identifying the system you have or need.
The fire strategy or building control drawings set the rating for each element. Integrity-only glass is cheaper and thinner, but its use on escape routes is restricted; insulating glass carries far fewer restrictions because people can pass it safely during a fire.
Glass in doors, side panels and low-level positions has to meet impact safety rules as well as the fire rating. Most modern fire glass carries an impact classification; old wired glass usually does not.
No. A frame is only rated with the glass types and pane sizes it was tested or assessed with. We check the frame's evidence before quoting, and if the existing frame is unknown we say so and price the options.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Whether the building is in central Wallington or the wider SM6, SM5, CR4, SM2, SM1, CR7 districts, we can survey and quote. We also cover Carshalton, Sutton, South Croydon. Wallington sits within our Greater London coverage, alongside Carshalton.
We can phase work in Wallington around residents, staff or pupils, with out-of-hours options.
If an existing frame in a Wallington building has no traceable evidence, we say so and price the options rather than guess.
You receive the classification references, glass marks and installation photographs for your fire safety records.
We can survey and quote for schools and colleges, public buildings and other building types in Wallington.
Integrity glass can be similar in thickness to standard glass. Insulating glass is laminated from several layers, so it gets markedly thicker and heavier as the rating increases from EI 30 to EI 120.
Ordinary toughened safety glass is not. It can shatter early in a fire. Fire-resistant integrity glass is specially processed or formulated and only gains a rating when fitted in a tested frame and glazing system.
Survey timing in Wallington depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Yes. We survey and install in Wallington and across Greater London, including the SM6 district and nearby Carshalton.
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →E and EW glass where flames and hot gases must be stopped.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
A survey in Wallington confirms sizes, access, existing evidence and fixing conditions.
Your quote lists each item with its classification and the evidence it relies on.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.