Tested fire-rated glazing systemsSurvey, supply and install UK-wideEvidence pack on handover
0800 088 6248
FIRE-GLAZING
Greater London · E14

Fire-Rated Windows for Canary Wharf buildings

For Canary Wharf buildings, we supply, replace and check fire-rated windows wherever the fire strategy depends on it, working to the tested system rather than the glass alone.

E 30 – EI 60E14England

Quote for Canary Wharf

Tell us what you need. We reply with next steps and a guide price.

What's involved with fire-rated windows in Canary Wharf

Most fire-rated windows are fixed lights, because opening windows need the opening sash, hinges and locks to be tested too. We supply and install fixed and, where tested, opening fire-rated windows in steel, aluminium and timber, matched to the surrounding windows where possible.

  • Matching sightlines to adjacent non-rated windows
  • Fire-stopping to the wall opening
  • Boundary-wall and escape-route windows
  • External-grade fire glass in sealed units

Where we work around Canary Wharf

Survey visits can be arranged anywhere in Canary Wharf, including the E14, SE16, E3, E1W, E1, SE8 districts, and in nearby Bow, Canning Town, Greenwich. Canary Wharf sits within our Greater London coverage, alongside Bow.

Key checks for Canary Wharf projects

Boundary distance

The closer a wall is to a boundary, the less unprotected area it can have. Fixed windows that meet the wall's full fire-resistance requirement, including insulation where required, are not counted as unprotected area; integrity-only glazing generally still is.

Why fixed lights are common

An opening sash introduces gaps and hardware that all need testing. Fixed fire-rated windows are simpler and more widely available.

Retrofits

Replacing a non-rated window near a boundary is often triggered by an extension or change of use. We survey the opening before quoting.

Which rules apply to fire-rated windows in Canary Wharf?

England Which rules apply?

Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.

Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.

In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.

What every Canary Wharf quote includes

Fixed written quotes

After survey you get a fixed written quote for the agreed scope, so Canary Wharf budgets are not open-ended.

Evidence you can file

You receive the classification references, glass marks and installation photographs for your fire safety records.

Rated systems, not just rated glass

Every quote in Canary Wharf identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.

Building types we cover in Canary Wharf

We can survey and quote for public buildings, healthcare buildings and other building types in Canary Wharf.

Fire-Rated Windows: Canary Wharf questions

Do fire-rated windows look different?

Frames can be slightly heavier, but most can be finished to match surrounding windows.

When do I need a fire-rated window?

Usually when a wall is close to a boundary, when a window overlooks a protected escape route, or when part of a building faces another part at close range. Your designer or building control will confirm.

Which rules apply to fire-rated glazing in Canary Wharf?

Building work in Canary Wharf follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.

Do you work on occupied buildings in Canary Wharf?

Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.

Related

Related services in Canary Wharf

Process

What happens next

Tell us what you have

Send drawings, a fire risk assessment action or photos of the glass marks.

Site visit

A survey in Canary Wharf confirms sizes, access, existing evidence and fixing conditions.

Written quote

You receive a written quote naming the tested system and classification.

Fit and record

We install, photograph seals and fixings before closing up, and hand over the schedule.

Need fire-rated glazing checked, replaced or installed?

Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.

Call freeGet a quote