Fanlights, Side Panels & Borrowed Lights
Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →From the NE28 district outwards, we arrange timber fire-rated screens for buildings across Wallsend, matching glass, frames and seals to tested evidence rather than guesswork.
Tell us what you need. We reply with next steps and a guide price.
The rating depends on the timber species and density, frame sections, bead profiles, fixings and the glazing seals used in the test. We build timber screens to a tested specification, or to a formal assessment, and finish them without compromising the intumescent details.
We can phase work in Wallsend around residents, staff or pupils, with out-of-hours options.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
You receive the classification references, glass marks and installation photographs for your fire safety records.
Paint and stain are fine on the timber, but intumescent seals must stay clear of paint. We mask them during finishing.
Timber frames need dry conditions on site and acclimatisation before glazing to avoid movement around the glass.
Bead profile, height and fixing type and spacing are all taken from the test. Short-cutting the fixings is a common reason screens fail inspection.
Our Tyne and Wear coverage takes in Wallsend (NE28, NE31, NE6, NE32, NE7, NE2) and the neighbouring towns of Hebburn, Jarrow, Felling. Wallsend is about 5 km from Newcastle upon Tyne, the largest town in our Tyne and Wear coverage.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Sector guides below cover blocks of flats, care homes and other buildings in Wallsend.
Yes. The timber can be painted, stained or lacquered. Intumescent seals are kept clear of paint.
Yes. Hardwood screens are tested to 30 and 60 minutes in many configurations, with the right glass, beads and seals.
Building work in Wallsend follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
A survey in Wallsend confirms sizes, access, existing evidence and fixing conditions.
We set out the system, glass, evidence and programme, with a fixed price.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.