Fanlights, Side Panels & Borrowed Lights
Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →For Felling buildings, we supply, replace and check timber fire-rated screens wherever the fire strategy depends on it, working to the tested system rather than the glass alone.
Tell us what you need. We reply with next steps and a guide price.
The rating depends on the timber species and density, frame sections, bead profiles, fixings and the glazing seals used in the test. We build timber screens to a tested specification, or to a formal assessment, and finish them without compromising the intumescent details.
Bead profile, height and fixing type and spacing are all taken from the test. Short-cutting the fixings is a common reason screens fail inspection.
Heavier insulating glass may need larger sections; we confirm the frame can carry the chosen build-up.
Paint and stain are fine on the timber, but intumescent seals must stay clear of paint. We mask them during finishing.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Our Tyne and Wear coverage takes in Felling (NE10, NE8, NE9, NE6, NE1, NE2) and the neighbouring towns of Gateshead, Newcastle upon Tyne, Hebburn. Newcastle upon Tyne, around 4 km from Felling, is the largest town in the same coverage area.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
We can phase work in Felling around residents, staff or pupils, with out-of-hours options.
You receive the classification references, glass marks and installation photographs for your fire safety records.
We can survey and quote for blocks of flats, industrial units and other building types in Felling.
Sometimes. If the frame can be shown to be suitable, we can replace non-rated glass and add the correct seals and beads. Where it cannot, replacement is the honest answer.
Yes. Hardwood screens are tested to 30 and 60 minutes in many configurations, with the right glass, beads and seals.
Yes. We survey and install in Felling and across Tyne and Wear, including the NE10 district and nearby Gateshead.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
A survey in Felling confirms sizes, access, existing evidence and fixing conditions.
You receive a written quote naming the tested system and classification.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.