Tested fire-rated glazing systemsSurvey, supply and install UK-wideEvidence pack on handover
0800 088 6248
FIRE-GLAZING
South Glamorgan · CF62

Fire-Rated Glazed Screens — Barry and CF62

Our fire-rated glazed screens service covers Barry and neighbouring areas such as Penarth and Cardiff, with every job built around a tested system.

E 30 – EI 120CF62Wales

Quote for Barry

Tell us what you need. We reply with next steps and a guide price.

Fire-Rated Glazed Screens in Barry: what's included

We design, supply and install fire-rated screens in steel, aluminium, timber and frameless formats, working from the rating and positions on your fire strategy. Every screen is built within the limits of its test or assessment evidence: pane sizes, transom and mullion spacing, glass type and the way it is fixed to the surrounding structure.

  • Integrated fire doors and glazed doorsets
  • Survey and setting-out against the fire strategy drawings
  • Integrity or insulating glass to the required classification
  • Steel, aluminium, timber or frameless frame systems

Before you order fire-rated glazed screens: what matters

Building control

New screens, and changes to existing fire-resisting walls, are normally building work. We provide the product evidence your building control body or approved inspector will ask for.

Acoustic and security needs

Fire glass can be combined with acoustic or security performance in many systems. We confirm the combined build-up is covered before pricing it.

What the screen is fixed to matters

Test evidence covers the screen's connection to specific supporting constructions, such as masonry, concrete or a tested partition. Fixing into a lightweight wall that is not covered can undermine the rating, so we check the substrate first.

Wales regulations that shape the job

Wales Which rules apply?

Building regulations are devolved in Wales, so fire safety design follows the Welsh Ministers' version of Approved Document B rather than the English one, alongside impact safety guidance for glazing.

The Regulatory Reform (Fire Safety) Order 2005 applies in Wales, so the responsible person must maintain fire-resisting glazing as part of the premises' fire safety measures. The Fire Safety Act 2021 confirmed this extends to the structure, external walls and flat entrance doors of multi-occupied residential buildings.

Wales is introducing its own building safety regime for occupied residential buildings, so check current Welsh requirements before planning major works to blocks of flats.

Barry coverage and nearby towns

Whether the building is in central Barry or the wider CF62, CF63 districts, we can survey and quote. We also cover Penarth, Cardiff, Caerphilly. Barry lies roughly 11 km from Cardiff, within our South Glamorgan coverage.

What every Barry quote includes

Rated systems, not just rated glass

Every quote in Barry identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.

Honest about unknowns

If an existing frame in a Barry building has no traceable evidence, we say so and price the options rather than guess.

Fixed written quotes

After survey you get a fixed written quote for the agreed scope, so Barry budgets are not open-ended.

Building types we cover in Barry

Sector guides below cover hotels, industrial units and other buildings in Barry.

FAQs for Barry

Can a fire-rated screen be fully glazed?

Yes. Many screens are glazed from floor to ceiling, subject to the classification needed on that route and any impact safety requirements at low level.

Can you add a screen to an occupied building?

Yes. We plan dust control, out-of-hours working and temporary protection so the building can stay in use where the fire strategy allows.

Which rules apply to fire-rated glazing in Barry?

Barry is in Wales, where the Welsh Approved Document B applies to building work and the Regulatory Reform (Fire Safety) Order 2005 covers occupied premises.

Do you work on occupied buildings in Barry?

Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.

Related

Related services in Barry

Process

What happens next

Tell us what you have

Send drawings, a fire risk assessment action or photos of the glass marks.

Survey

We visit Barry to measure, record existing marks and check the frames and substrate.

Written proposal

We set out the system, glass, evidence and programme, with a fixed price.

Complete and document

Work is completed to the manufacturer's details and documented for your records.

Need fire-rated glazing checked, replaced or installed?

Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.

Call freeGet a quote