Steel Fire-Rated Screens
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →Our fire-rated glazed screens service covers Seaford and neighbouring areas such as Eastbourne and Hailsham, with every job built around a tested system.
Tell us what you need. We reply with next steps and a guide price.
We design, supply and install fire-rated screens in steel, aluminium, timber and frameless formats, working from the rating and positions on your fire strategy. Every screen is built within the limits of its test or assessment evidence: pane sizes, transom and mullion spacing, glass type and the way it is fixed to the surrounding structure.
A door in a glazed screen has to be tested in that configuration or covered by a doorset certificate and an assessment for the screen. We specify the door and screen as one system rather than mixing products.
Building guidance limits where integrity-only glazing can sit on protected escape routes, and in some positions restricts it to above a set height from the floor. Insulating screens are not restricted in the same way, so the route plan often decides the glass.
Test evidence covers the screen's connection to specific supporting constructions, such as masonry, concrete or a tested partition. Fixing into a lightweight wall that is not covered can undermine the rating, so we check the substrate first.
We cover Seaford and the surrounding postcode districts, including BN25. Nearby towns we also serve include Eastbourne, Hailsham, Brighton. Seaford is about 18 km from Brighton, the largest town in our East Sussex coverage.
Every quote in Seaford identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
We can phase work in Seaford around residents, staff or pupils, with out-of-hours options.
After survey you get a fixed written quote for the agreed scope, so Seaford budgets are not open-ended.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Fire-rated glazed screens applies to many building types in Seaford, including care homes and offices.
They need periodic checks for damaged glass, missing beads, failed seals and unauthorised changes such as new cable holes. We can carry out these checks as part of a survey.
Yes. We plan dust control, out-of-hours working and temporary protection so the building can stay in use where the fire strategy allows.
Building work in Seaford follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Slim steel frames for long spans, high ratings and heavy glass.
Learn more →Light, modern aluminium framing tested for fire.
Learn more →Hardwood screens and borrowed lights tested for fire.
Learn more →Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We measure each opening in Seaford and check what the existing frames can accept.
You receive a written quote naming the tested system and classification.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.