Frameless Fire-Rated Glazing
Butt-jointed fire glass walls with minimal frames.
Learn more →From the PO19 district outwards, we arrange fire-rated glass partitions for buildings across Chichester, matching glass, frames and seals to tested evidence rather than guesswork.
Tell us what you need. We reply with next steps and a guide price.
Office fit-outs often only need fire-rated glazing on certain lines, such as corridors that serve as escape routes. We work from your fire strategy to rate only what needs rating, and match the look across the rest of the floor so the design stays consistent.
Large glass walls need manifestation so people can see them. Applied film must be compatible with the glass and not cover any marks building control may need to see.
A fire-rated partition is only as good as the construction above it. If the wall has to run to the slab, the ceiling void needs fire-stopping or a rated head detail.
Rated partitions need fire-stopping inspected before ceilings close. We plan inspection points into the fit-out programme.
Our West Sussex coverage takes in Chichester (PO19, PO20) and the neighbouring towns of Bognor Regis, Havant, Littlehampton. Chichester lies roughly 52 km from Crawley, within our West Sussex coverage.
After survey you get a fixed written quote for the agreed scope, so Chichester budgets are not open-ended.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
You receive the classification references, glass marks and installation photographs for your fire safety records.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Sector guides below cover offices, schools and colleges and other buildings in Chichester.
Only where the fire strategy says the wall is fire-resisting, for example along a protected escape corridor or a compartment line. Many meeting room walls do not need a rating.
Yes. We can supply and install the rated glazing package within a wider fit-out, working to your programme.
Survey timing in Chichester depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Building work in Chichester follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Butt-jointed fire glass walls with minimal frames.
Learn more →Light, modern aluminium framing tested for fire.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
A survey in Chichester confirms sizes, access, existing evidence and fixing conditions.
Your quote lists each item with its classification and the evidence it relies on.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.