Frameless Fire-Rated Glazing
Butt-jointed fire glass walls with minimal frames.
Learn more →If a building in Surbiton needs fire-rated glass partitions, the starting point is the rating its fire strategy requires. We confirm that, survey the openings and quote a tested system to suit.
Tell us what you need. We reply with next steps and a guide price.
Office fit-outs often only need fire-rated glazing on certain lines, such as corridors that serve as escape routes. We work from your fire strategy to rate only what needs rating, and match the look across the rest of the floor so the design stays consistent.
After survey you get a fixed written quote for the agreed scope, so Surbiton budgets are not open-ended.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
If an existing frame in a Surbiton building has no traceable evidence, we say so and price the options rather than guess.
A fire-rated partition is only as good as the construction above it. If the wall has to run to the slab, the ceiling void needs fire-stopping or a rated head detail.
Meeting rooms often need acoustic performance too. Some fire partition systems are tested for both; we confirm the combination.
Demountable systems can be reconfigured, but moving a rated partition means rechecking its evidence and fire-stopping in the new position.
Our Greater London coverage takes in Surbiton (KT5, KT6, KT1, KT7, KT9, KT2) and the neighbouring towns of New Malden, Esher, Hampton. We cover Surbiton as part of our Greater London coverage.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Sector guides below cover public buildings, offices and other buildings in Surbiton.
Only where the fire strategy says the wall is fire-resisting, for example along a protected escape corridor or a compartment line. Many meeting room walls do not need a rating.
Some butt-jointed systems are tested for fire. See our frameless fire-rated glazing service for what is possible.
Survey timing in Surbiton depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
Butt-jointed fire glass walls with minimal frames.
Learn more →Light, modern aluminium framing tested for fire.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We visit Surbiton to measure, record existing marks and check the frames and substrate.
You receive a written quote naming the tested system and classification.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.