Fire-Rated Glass Partitions
Office glass partitions where the wall has to be fire-resisting.
Learn more →From the KT5 district outwards, we arrange frameless fire-rated glazing for buildings across Surbiton, matching glass, frames and seals to tested evidence rather than guesswork.
Tell us what you need. We reply with next steps and a guide price.
Frameless fire glazing only works within tight, tested limits: specific glass types, joint widths, sealants, channel details and maximum heights. We specify it where the evidence supports your layout, and tell you plainly when a slim framed system is the better route.
True frameless fire doors are rare; most frameless walls use a slim framed door within the run. We show you the options on drawings.
Maximum heights and the ability to form corners vary by system. Corners may need a post or a specific tested joint.
Frameless fire glazing is at the top of the price range because of the glass and precision required.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Survey visits can be arranged anywhere in Surbiton, including the KT5, KT6, KT1, KT7, KT9, KT2 districts, and in nearby New Malden, Esher, Hampton. We cover Surbiton as part of our Greater London coverage.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
Every quote in Surbiton identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
If an existing frame in a Surbiton building has no traceable evidence, we say so and price the options rather than guess.
We can survey and quote for public buildings, offices and other building types in Surbiton.
Yes, typically. It also needs more careful site protection.
Yes, using tested butt-jointed systems, usually with insulating glass. It must be installed exactly to the tested details.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Office glass partitions where the wall has to be fire-resisting.
Learn more →EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
A survey in Surbiton confirms sizes, access, existing evidence and fixing conditions.
You receive a written quote naming the tested system and classification.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.