Fire-Rated Glass Partitions
Office glass partitions where the wall has to be fire-resisting.
Learn more →If a building in Bedworth needs frameless fire-rated glazing, the starting point is the rating its fire strategy requires. We confirm that, survey the openings and quote a tested system to suit.
Tell us what you need. We reply with next steps and a guide price.
Frameless fire glazing only works within tight, tested limits: specific glass types, joint widths, sealants, channel details and maximum heights. We specify it where the evidence supports your layout, and tell you plainly when a slim framed system is the better route.
Whether the building is in central Bedworth or the wider CV12, CV11, CV6 districts, we can survey and quote. We also cover Nuneaton, Coventry, Hinckley. Nuneaton, around 5 km from Bedworth, is the largest town in the same coverage area.
Maximum heights and the ability to form corners vary by system. Corners may need a post or a specific tested joint.
Frameless glass is exposed during the build. We plan protection until other trades finish.
The sealant, joint width and any interlayer in the joint come from the test. Generic silicone in a fire glass joint is not acceptable.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
If an existing frame in a Bedworth building has no traceable evidence, we say so and price the options rather than guess.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
After survey you get a fixed written quote for the agreed scope, so Bedworth budgets are not open-ended.
We can survey and quote for public buildings, industrial units and other building types in Bedworth.
Yes, typically. It also needs more careful site protection.
Usually through a slim framed door set into the run, chosen so the combination is covered by evidence.
Survey timing in Bedworth depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
Office glass partitions where the wall has to be fire-resisting.
Learn more →EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
We visit Bedworth to measure, record existing marks and check the frames and substrate.
Your quote lists each item with its classification and the evidence it relies on.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.