Fire-Rated Glass Partitions
Office glass partitions where the wall has to be fire-resisting.
Learn more →From the NE37 district outwards, we arrange frameless fire-rated glazing for buildings across Washington, matching glass, frames and seals to tested evidence rather than guesswork.
Tell us what you need. We reply with next steps and a guide price.
Frameless fire glazing only works within tight, tested limits: specific glass types, joint widths, sealants, channel details and maximum heights. We specify it where the evidence supports your layout, and tell you plainly when a slim framed system is the better route.
The sealant, joint width and any interlayer in the joint come from the test. Generic silicone in a fire glass joint is not acceptable.
Frameless glass is exposed during the build. We plan protection until other trades finish.
Channels at the head have to allow for slab movement without loading the glass.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Coverage around Washington includes the NE37, NE38 districts and nearby Chester-le-Street, Felling, Houghton-le-Spring. Newcastle upon Tyne, around 10 km from Washington, is the largest town in the same coverage area.
After survey you get a fixed written quote for the agreed scope, so Washington budgets are not open-ended.
We can phase work in Washington around residents, staff or pupils, with out-of-hours options.
You receive the classification references, glass marks and installation photographs for your fire safety records.
We can survey and quote for public buildings, retail and leisure units and other building types in Washington.
Each system states a maximum height. We check your floor-to-ceiling height against it during design.
Yes, using tested butt-jointed systems, usually with insulating glass. It must be installed exactly to the tested details.
Building work in Washington follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Survey timing in Washington depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Office glass partitions where the wall has to be fire-resisting.
Learn more →EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We measure each opening in Washington and check what the existing frames can accept.
You receive a written quote naming the tested system and classification.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.