Fire-Rated Glass Partitions
Office glass partitions where the wall has to be fire-resisting.
Learn more →When a fire strategy, inspection report or building control comment in Hertford calls for glazing tested to resist fire, our frameless fire-rated glazing service covers survey, supply and installation.
Tell us what you need. We reply with next steps and a guide price.
Frameless fire-rated glazing is a glass wall where panes meet edge to edge with a tested sealant joint instead of vertical frames, held in discreet head and base channels. It gives an almost uninterrupted view while still being tested to resist fire.
Frameless fire glazing is at the top of the price range because of the glass and precision required.
Maximum heights and the ability to form corners vary by system. Corners may need a post or a specific tested joint.
The sealant, joint width and any interlayer in the joint come from the test. Generic silicone in a fire glass joint is not acceptable.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Coverage around Hertford includes the SG13, SG14 districts and nearby Hoddesdon, Welwyn Garden City, Hatfield. Watford, around 27 km from Hertford, is the largest town in the same coverage area.
If an existing frame in a Hertford building has no traceable evidence, we say so and price the options rather than guess.
We can phase work in Hertford around residents, staff or pupils, with out-of-hours options.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
Sector guides below cover hotels, care homes and other buildings in Hertford.
Each system states a maximum height. We check your floor-to-ceiling height against it during design.
Yes, using tested butt-jointed systems, usually with insulating glass. It must be installed exactly to the tested details.
Survey timing in Hertford depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Yes. We survey and install in Hertford and across Hertfordshire, including the SG13 district and nearby Hoddesdon.
Office glass partitions where the wall has to be fire-resisting.
Learn more →EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We measure each opening in Hertford and check what the existing frames can accept.
We set out the system, glass, evidence and programme, with a fixed price.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.