Fire-Rated Glass Partitions
Office glass partitions where the wall has to be fire-resisting.
Learn more →Frameless fire-rated glazing in Pimlico is usually needed for one of three reasons: new building work, a change to an existing fire-resisting wall, or defects found in an inspection. We handle all three.
Tell us what you need. We reply with next steps and a guide price.
Frameless fire-rated glazing is a glass wall where panes meet edge to edge with a tested sealant joint instead of vertical frames, held in discreet head and base channels. It gives an almost uninterrupted view while still being tested to resist fire.
Whether the building is in central Pimlico or the wider SW1, SW8, SW1A, W1M, SW1X, SE11 districts, we can survey and quote. We also cover Westminster, Battersea, Chelsea. Pimlico sits within our Greater London coverage, alongside Westminster.
Frameless glass is exposed during the build. We plan protection until other trades finish.
Frameless fire glazing is at the top of the price range because of the glass and precision required.
Channels at the head have to allow for slab movement without loading the glass.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Every quote in Pimlico identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
If an existing frame in a Pimlico building has no traceable evidence, we say so and price the options rather than guess.
We can phase work in Pimlico around residents, staff or pupils, with out-of-hours options.
Sector guides below cover offices, public buildings and other buildings in Pimlico.
Each system states a maximum height. We check your floor-to-ceiling height against it during design.
Usually through a slim framed door set into the run, chosen so the combination is covered by evidence.
Survey timing in Pimlico depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Building work in Pimlico follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Office glass partitions where the wall has to be fire-resisting.
Learn more →EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
A survey in Pimlico confirms sizes, access, existing evidence and fixing conditions.
We set out the system, glass, evidence and programme, with a fixed price.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.