Fire-Rated Glass Partitions
Office glass partitions where the wall has to be fire-resisting.
Learn more →For Cheltenham buildings, we supply, replace and check frameless fire-rated glazing wherever the fire strategy depends on it, working to the tested system rather than the glass alone.
Tell us what you need. We reply with next steps and a guide price.
Frameless fire-rated glazing is a glass wall where panes meet edge to edge with a tested sealant joint instead of vertical frames, held in discreet head and base channels. It gives an almost uninterrupted view while still being tested to resist fire.
Frameless glass is exposed during the build. We plan protection until other trades finish.
Frameless fire glazing is at the top of the price range because of the glass and precision required.
The sealant, joint width and any interlayer in the joint come from the test. Generic silicone in a fire glass joint is not acceptable.
Our Gloucestershire coverage takes in Cheltenham (GL50, GL51, GL52) and the neighbouring towns of Tewkesbury, Gloucester, Stroud. Gloucester, around 12 km from Cheltenham, is the largest town in the same coverage area.
If an existing frame in a Cheltenham building has no traceable evidence, we say so and price the options rather than guess.
Every quote in Cheltenham identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Sector guides below cover care homes, industrial units and other buildings in Cheltenham.
Yes, using tested butt-jointed systems, usually with insulating glass. It must be installed exactly to the tested details.
Yes, typically. It also needs more careful site protection.
Yes. We survey and install in Cheltenham and across Gloucestershire, including the GL50 district and nearby Tewkesbury.
Survey timing in Cheltenham depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Office glass partitions where the wall has to be fire-resisting.
Learn more →EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We measure each opening in Cheltenham and check what the existing frames can accept.
Your quote lists each item with its classification and the evidence it relies on.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.