Tested fire-rated glazing systemsSurvey, supply and install UK-wideEvidence pack on handover
0800 088 6248
FIRE-GLAZING
Kent · CT14

Deal aluminium fire-rated screens

From the CT14 district outwards, we arrange aluminium fire-rated screens for buildings across Deal, matching glass, frames and seals to tested evidence rather than guesswork.

E 30 – EI 60CT14England

Quote for Deal

Tell us what you need. We reply with next steps and a guide price.

What's involved with aluminium fire-rated screens in Deal

Aluminium softens at a lower temperature than steel, so fire-rated aluminium systems rely on specific internal inserts, reinforcements and glazing details. We install only the tested system as a whole, in anodised or powder-coated finishes, with doors and side panels where the evidence allows.

  • Fire-stopping and perimeter details
  • Tested aluminium fire screen systems
  • Handover evidence
  • Anodised and powder-coated finishes

What you can expect in Deal

Fixed written quotes

After survey you get a fixed written quote for the agreed scope, so Deal budgets are not open-ended.

Rated systems, not just rated glass

Every quote in Deal identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.

Work around occupied buildings

We can phase work in Deal around residents, staff or pupils, with out-of-hours options.

Key checks for Deal projects

Inserts make the rating

Fire-rated aluminium profiles contain insulating and intumescent inserts that standard profiles do not. Swapping in a standard section to save cost removes the rating.

Ratings available

Aluminium systems are commonly available at 30 and 60 minutes; higher ratings are less common and may point to a steel system instead.

Deflection and fixings

Head details and fixing centres come from the system documentation, especially beneath long-span slabs.

Deal coverage and nearby towns

Whether the building is in central Deal or the wider CT14 districts, we can survey and quote. We also cover Dover, Ramsgate, Broadstairs. Deal lies roughly 62 km from Maidstone, within our Kent coverage.

Fire glazing rules in England

England Which rules apply?

Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.

Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.

In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.

Deal building types

Sector guides below cover hotels, care homes and other buildings in Deal.

Questions about aluminium fire-rated screens in Deal

Is aluminium suitable for fire-rated glazing?

Yes, when it is a system designed and tested for fire. Ordinary aluminium partitions and windows are not fire-rated, however thick the glass.

Will the frames match our other glazing?

Usually they can be matched closely in profile and colour so rated and non-rated areas look consistent.

Do you carry out aluminium fire-rated screens in Deal?

Yes. We survey and install in Deal and across Kent, including the CT14 district and nearby Dover.

Can you price aluminium fire-rated screens in Deal from photos?

We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.

Related

Related services in Deal

E 30 – EI 120

Fire-Rated Glazed Screens

Internal glazed screens that keep compartments and corridors protected.

Learn more →
Process

What happens next

Share the details

Send the fire strategy extract, inspection report or a few photos of the openings.

Survey

We visit Deal to measure, record existing marks and check the frames and substrate.

Written quote

You receive a written quote naming the tested system and classification.

Fit and record

We install, photograph seals and fixings before closing up, and hand over the schedule.

Need fire-rated glazing checked, replaced or installed?

Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.

Call freeGet a quote