Fire Glazing Remedial Works
Putting right the defects found in surveys and fire risk assessments.
Learn more →From the SM4 district outwards, we arrange fire glazing surveys for buildings across Morden, matching glass, frames and seals to tested evidence rather than guesswork.
Tell us what you need. We reply with next steps and a guide price.
Surveys help building owners, managing agents and those responsible for fire safety understand their compartmentation, prepare for building control scrutiny, and plan remedial budgets. We produce a clear schedule with photographs, priorities and costed remedial options.
A visual survey records marks, materials and visible defects. It cannot prove a frame's rating without evidence, so we flag unknowns clearly rather than guessing.
We can re-inspect after remedial work and update the schedule.
In England, information about fire-resisting glazing forms part of the building's safety information. A survey helps build that record.
Our Greater London coverage takes in Morden (SM4, SW20, CR4, SW19, KT4, SM5) and the neighbouring towns of Mitcham, Wimbledon, Carshalton. Morden is one of the Greater London districts we cover.
After survey you get a fixed written quote for the agreed scope, so Morden budgets are not open-ended.
Every quote in Morden identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
We can phase work in Morden around residents, staff or pupils, with out-of-hours options.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
We can survey and quote for hotels, student accommodation and other building types in Morden.
No. A fire risk assessment looks at the whole premises. A fire glazing survey looks in detail at the glazed elements of the compartmentation.
It depends on the number of glazed elements and access. Most single buildings are surveyed in a day or less.
Yes. We survey and install in Morden and across Greater London, including the SM4 district and nearby Mitcham.
Building work in Morden follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Putting right the defects found in surveys and fire risk assessments.
Learn more →Replace old Georgian wired glass with modern fire glass.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
We measure each opening in Morden and check what the existing frames can accept.
Your quote lists each item with its classification and the evidence it relies on.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.