Fire Glazing Remedial Works
Putting right the defects found in surveys and fire risk assessments.
Learn more →From the TW13 district outwards, we arrange fire glazing surveys for buildings across Feltham, matching glass, frames and seals to tested evidence rather than guesswork.
Tell us what you need. We reply with next steps and a guide price.
Surveys help building owners, managing agents and those responsible for fire safety understand their compartmentation, prepare for building control scrutiny, and plan remedial budgets. We produce a clear schedule with photographs, priorities and costed remedial options.
Survey visits can be arranged anywhere in Feltham, including the TW13, TW14, TW15, TW6, TW5, TW3 districts, and in nearby Hanworth, Ashford, Hounslow. Feltham is one of the Greater London districts we cover.
In England, information about fire-resisting glazing forms part of the building's safety information. A survey helps build that record.
We can re-inspect after remedial work and update the schedule.
Unmarked or ordinary glass in fire-resisting walls, missing seals, painted-over intumescent strips, wrong beads and unsealed service holes are frequent findings.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
After survey you get a fixed written quote for the agreed scope, so Feltham budgets are not open-ended.
We can phase work in Feltham around residents, staff or pupils, with out-of-hours options.
You receive the classification references, glass marks and installation photographs for your fire safety records.
Sector guides below cover blocks of flats, hotels and other buildings in Feltham.
Yes. We provide costed remedial options and can carry out the work.
No. A fire risk assessment looks at the whole premises. A fire glazing survey looks in detail at the glazed elements of the compartmentation.
Survey timing in Feltham depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Building work in Feltham follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Putting right the defects found in surveys and fire risk assessments.
Learn more →Replace old Georgian wired glass with modern fire glass.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Tell us the rating required, sizes and building type, or ask us to find out.
A survey in Feltham confirms sizes, access, existing evidence and fixing conditions.
We set out the system, glass, evidence and programme, with a fixed price.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.