Fire Glazing Surveys
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →If a building in Gateshead needs fire glazing remedial works, the starting point is the rating its fire strategy requires. We confirm that, survey the openings and quote a tested system to suit.
Tell us what you need. We reply with next steps and a guide price.
Fire glazing remedial works are the repairs and replacements that bring glazed fire-resisting elements back into line with their required performance: replacing unsuitable glass, refitting beads and seals, sealing service penetrations, and replacing frames that cannot be shown to be rated.
Intumescent strips painted over during redecoration can be replaced without changing the glass.
Cables and pipes through glazed screens and their surrounds must be fire-stopped with products tested for that application.
We price each defect separately so you can approve urgent items first.
Survey visits can be arranged anywhere in Gateshead, including the NE8, NE1, NE10, NE2, NE6, NE4 districts, and in nearby Newcastle upon Tyne, Felling, Gosforth. Gateshead lies roughly 1 km from Newcastle upon Tyne, within our Tyne and Wear coverage.
After survey you get a fixed written quote for the agreed scope, so Gateshead budgets are not open-ended.
If an existing frame in a Gateshead building has no traceable evidence, we say so and price the options rather than guess.
Every quote in Gateshead identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Fire glazing remedial works applies to many building types in Gateshead, including offices and healthcare buildings.
Yes, before and after for every item, plus a completion schedule.
We explain the options: obtaining evidence from the manufacturer, a formal assessment, or replacing the frame with a tested system.
Survey timing in Gateshead depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Building work in Gateshead follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We measure each opening in Gateshead and check what the existing frames can accept.
We set out the system, glass, evidence and programme, with a fixed price.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.