Fire Glazing Surveys
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →Our fire glazing remedial works service covers Felling and neighbouring areas such as Gateshead and Newcastle upon Tyne, with every job built around a tested system.
Tell us what you need. We reply with next steps and a guide price.
We work from fire risk assessments, fire door inspection reports and our own surveys, pricing each item clearly and completing the work with photographs and a schedule you can file. Where an item cannot be fixed without evidence from a manufacturer or test body, we say so and set out the options.
Coverage around Felling includes the NE10, NE8, NE9, NE6, NE1, NE2 districts and nearby Gateshead, Newcastle upon Tyne, Hebburn. Felling is about 4 km from Newcastle upon Tyne, the largest town in our Tyne and Wear coverage.
We plan remedial programmes around residents, pupils or staff, with phasing and clear communication.
Intumescent strips painted over during redecoration can be replaced without changing the glass.
Remedial glass and seals must suit the existing frame's evidence. Where that evidence is missing, we raise it before work starts.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
If an existing frame in a Felling building has no traceable evidence, we say so and price the options rather than guess.
After survey you get a fixed written quote for the agreed scope, so Felling budgets are not open-ended.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
Sector guides below cover offices, public buildings and other buildings in Felling.
Yes. We prioritise by risk and agree phases with you.
Yes. Send the report and we will price the glazing-related actions item by item.
Yes. We survey and install in Felling and across Tyne and Wear, including the NE10 district and nearby Gateshead.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
A survey in Felling confirms sizes, access, existing evidence and fixing conditions.
We set out the system, glass, evidence and programme, with a fixed price.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.