Fire Glazing Surveys
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →We provide fire glazing remedial works in Sheffield and across South Yorkshire, working from the classification your building needs and handing over the evidence that proves what was fitted.
Tell us what you need. We reply with next steps and a guide price.
We work from fire risk assessments, fire door inspection reports and our own surveys, pricing each item clearly and completing the work with photographs and a schedule you can file. Where an item cannot be fixed without evidence from a manufacturer or test body, we say so and set out the options.
We can phase work in Sheffield around residents, staff or pupils, with out-of-hours options.
If an existing frame in a Sheffield building has no traceable evidence, we say so and price the options rather than guess.
Every quote in Sheffield identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
Each completed item is photographed and cross-referenced to the original report so the action can be closed.
Intumescent strips painted over during redecoration can be replaced without changing the glass.
We price each defect separately so you can approve urgent items first.
Survey visits can be arranged anywhere in Sheffield, including the S1, S2, S3, S4, S7, S11 districts, and in nearby Rotherham, Dronfield, Chapeltown. Sheffield is the largest town in our South Yorkshire coverage.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Sector guides below cover public buildings, hotels and other buildings in Sheffield.
We explain the options: obtaining evidence from the manufacturer, a formal assessment, or replacing the frame with a tested system.
Yes. We prioritise by risk and agree phases with you.
Survey timing in Sheffield depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Building work in Sheffield follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We measure each opening in Sheffield and check what the existing frames can accept.
We set out the system, glass, evidence and programme, with a fixed price.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.