Fire Glazing Surveys
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →When a fire strategy, inspection report or building control comment in South Croydon calls for glazing tested to resist fire, our fire glazing remedial works service covers survey, supply and installation.
Tell us what you need. We reply with next steps and a guide price.
Fire glazing remedial works are the repairs and replacements that bring glazed fire-resisting elements back into line with their required performance: replacing unsuitable glass, refitting beads and seals, sealing service penetrations, and replacing frames that cannot be shown to be rated.
You receive the classification references, glass marks and installation photographs for your fire safety records.
If an existing frame in a South Croydon building has no traceable evidence, we say so and price the options rather than guess.
After survey you get a fixed written quote for the agreed scope, so South Croydon budgets are not open-ended.
We plan remedial programmes around residents, pupils or staff, with phasing and clear communication.
Each completed item is photographed and cross-referenced to the original report so the action can be closed.
Remedial glass and seals must suit the existing frame's evidence. Where that evidence is missing, we raise it before work starts.
Survey visits can be arranged anywhere in South Croydon, including the CR0, CR7, CR9, CR2, CR8, SM6 districts, and in nearby Croydon, Purley, Wallington. We cover South Croydon as part of our Greater London coverage.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
We can survey and quote for healthcare buildings, blocks of flats and other building types in South Croydon.
Yes. Send the report and we will price the glazing-related actions item by item.
Yes, before and after for every item, plus a completion schedule.
Building work in South Croydon follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Surveys that identify what fire glazing you have and what needs fixing.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We measure each opening in South Croydon and check what the existing frames can accept.
You receive a written quote naming the tested system and classification.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.