Fire-Resistant Glass
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →Our fire glass replacement service covers Archway and neighbouring areas such as Holloway and Muswell Hill, with every job built around a tested system.
Tell us what you need. We reply with next steps and a guide price.
We identify the existing glass from its marks, measure the opening, make the area safe and fit the correct replacement. If the original product is no longer made, we source an alternative covered by the frame's evidence or advise on the right next step.
Survey visits can be arranged anywhere in Archway, including the N19, N6, NW5, N4, N8, N7 districts, and in nearby Holloway, Muswell Hill, Chalk Farm. Archway is one of the Greater London districts we cover.
EI glass is laminated to size, so it can take longer to supply than integrity glass. We give you a realistic date.
Most fire glass is etched or printed with its product name and classification. A photo of the mark speeds up quoting.
Whoever is responsible for fire safety may need temporary measures until the new pane is fitted; we can advise on practical options.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
You receive the classification references, glass marks and installation photographs for your fire safety records.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
After survey you get a fixed written quote for the agreed scope, so Archway budgets are not open-ended.
We can survey and quote for public buildings, schools and colleges and other building types in Archway.
Lead times depend on the glass. Integrity glass is often quick to supply; insulating glass is made to size.
It may not perform as tested. Treat it as a defect and arrange replacement promptly.
Survey timing in Archway depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Building work in Archway follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Putting right the defects found in surveys and fire risk assessments.
Learn more →EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
We measure each opening in Archway and check what the existing frames can accept.
We set out the system, glass, evidence and programme, with a fixed price.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.