Fire-Resistant Glass
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →When a fire strategy, inspection report or building control comment in Swinton calls for glazing tested to resist fire, our integrity fire glass service covers survey, supply and installation.
Tell us what you need. We reply with next steps and a guide price.
We supply and fit integrity glass in screens, doors, vision panels and windows where the fire strategy allows it, and upgrade to EW or EI where it does not. Choosing correctly between E, EW and EI is where most of the cost on a project is decided.
Survey visits can be arranged anywhere in Swinton, including the M27, M30, M28, M6, M17, M50 districts, and in nearby Eccles, Walkden, Salford. Manchester, around 8 km from Swinton, is the largest town in the same coverage area.
EW glass limits radiation to 15 kW/m² measured one metre from the glass, reducing the risk of igniting materials or harming people nearby.
Building guidance restricts how much integrity-only glass can be used on protected escape routes and where it can sit. Check the route before choosing E glass.
Modern integrity glass is usually available with an impact classification, unlike plain wired glass.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
Every quote in Swinton identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
We can phase work in Swinton around residents, staff or pupils, with out-of-hours options.
Sector guides below cover hotels, blocks of flats and other buildings in Swinton.
In limited amounts and positions. Building guidance sets the rules; insulating glass is used where those limits are exceeded.
Yes, considerably, and it is thinner and lighter.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Survey timing in Swinton depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →Replace old Georgian wired glass with modern fire glass.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
A survey in Swinton confirms sizes, access, existing evidence and fixing conditions.
Your quote lists each item with its classification and the evidence it relies on.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.