Fire-Resistant Glass
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →When a fire strategy, inspection report or building control comment in Yeadon calls for glazing tested to resist fire, our insulated fire glass service covers survey, supply and installation.
Tell us what you need. We reply with next steps and a guide price.
Insulated fire glass, classified EI, is glazing that maintains integrity and keeps the temperature rise on the non-fire side within set limits for the rated time. It is usually made of several glass panes bonded with interlayers that foam into an insulating barrier when heated, or with a clear gel that absorbs heat.
Each step up in rating adds layers, so EI 120 is far thicker and heavier than EI 30. The frame has to be designed for it.
Some EI products are internal only. External use needs a product and edge seal approved for UV and weather.
Modern EI glass is clear in normal use, with high light transmission at lower ratings.
Whether the building is in central Yeadon or the wider LS19, LS20, LS18, BD10 districts, we can survey and quote. We also cover Guiseley, Shipley, Pudsey. Yeadon is about 12 km from Leeds, the largest town in our West Yorkshire coverage.
You receive the classification references, glass marks and installation photographs for your fire safety records.
After survey you get a fixed written quote for the agreed scope, so Yeadon budgets are not open-ended.
Every quote in Yeadon identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Sector guides below cover hotels, blocks of flats and other buildings in Yeadon.
It is a multi-layer product with specialist interlayers, and the frame and installation must suit its weight.
Yes. Once the interlayers have reacted, the glass has done its job and must be replaced.
Building work in Yeadon follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Survey timing in Yeadon depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →E and EW glass where flames and hot gases must be stopped.
Learn more →Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →Butt-jointed fire glass walls with minimal frames.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
A survey in Yeadon confirms sizes, access, existing evidence and fixing conditions.
Your quote lists each item with its classification and the evidence it relies on.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.