Fire-Resistant Glass
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →When a fire strategy, inspection report or building control comment in Wigan calls for glazing tested to resist fire, our insulated fire glass service covers survey, supply and installation.
Tell us what you need. We reply with next steps and a guide price.
EI glass is the choice where people need to pass close to the glass during a fire, where combustible materials sit near it, or where building guidance would otherwise restrict glazing. We supply and fit EI 30 to EI 120 glass in tested frames, internally and externally.
We can phase work in Wigan around residents, staff or pupils, with out-of-hours options.
You receive the classification references, glass marks and installation photographs for your fire safety records.
If an existing frame in a Wigan building has no traceable evidence, we say so and price the options rather than guess.
EI testing limits the average temperature rise on the unexposed face to 140°C and any single point to 180°C, which is why people can pass it.
When heated, the interlayers turn opaque and expand, forming an insulating shield. After a fire the glass will need replacing.
Some EI products are internal only. External use needs a product and edge seal approved for UV and weather.
Whether the building is in central Wigan or the wider WN1, WN3, WN2 districts, we can survey and quote. We also cover Hindley, Ashton-in-Makerfield, Westhoughton. Wigan is about 27 km from Manchester, the largest town in our Greater Manchester coverage.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
We can survey and quote for retail and leisure units, schools and colleges and other building types in Wigan.
The glazing system kept fire on one side (integrity) and limited the temperature rise on the other side (insulation) for at least 60 minutes in a standard fire test.
Yes, in normal conditions. It turns opaque only when heated in a fire.
Building work in Wigan follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →E and EW glass where flames and hot gases must be stopped.
Learn more →Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →Butt-jointed fire glass walls with minimal frames.
Learn more →Send drawings, a fire risk assessment action or photos of the glass marks.
A survey in Wigan confirms sizes, access, existing evidence and fixing conditions.
We set out the system, glass, evidence and programme, with a fixed price.
Installation to the system details, then a handover pack with photographs and evidence.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.