Fire-Resistant Glass
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →For Barking buildings, we supply, replace and check insulated fire glass wherever the fire strategy depends on it, working to the tested system rather than the glass alone.
Tell us what you need. We reply with next steps and a guide price.
EI glass is the choice where people need to pass close to the glass during a fire, where combustible materials sit near it, or where building guidance would otherwise restrict glazing. We supply and fit EI 30 to EI 120 glass in tested frames, internally and externally.
EI testing limits the average temperature rise on the unexposed face to 140°C and any single point to 180°C, which is why people can pass it.
Some EI products are internal only. External use needs a product and edge seal approved for UV and weather.
Each step up in rating adds layers, so EI 120 is far thicker and heavier than EI 30. The frame has to be designed for it.
Survey visits can be arranged anywhere in Barking, including the IG11, E6, IG1, E12, IG3, SE28 districts, and in nearby Ilford, Becontree, Thamesmead. Barking is one of the Greater London districts we cover.
After survey you get a fixed written quote for the agreed scope, so Barking budgets are not open-ended.
You receive the classification references, glass marks and installation photographs for your fire safety records.
We can phase work in Barking around residents, staff or pupils, with out-of-hours options.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
Sector guides below cover hotels, public buildings and other buildings in Barking.
Yes, in normal conditions. It turns opaque only when heated in a fire.
The glazing system kept fire on one side (integrity) and limited the temperature rise on the other side (insulation) for at least 60 minutes in a standard fire test.
We can give a guide range from photos and sizes, including a clear photo of any marks on the glass. A fixed price follows a survey.
Yes. We survey and install in Barking and across Greater London, including the IG11 district and nearby Ilford.
Integrity and insulating fire glass supplied and fitted into tested frames.
Learn more →E and EW glass where flames and hot gases must be stopped.
Learn more →Glazed screens and doors on protected stairs, lobbies and corridors.
Learn more →Butt-jointed fire glass walls with minimal frames.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
A survey in Barking confirms sizes, access, existing evidence and fixing conditions.
You receive a written quote naming the tested system and classification.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.