Insulated Fire Glass (EI)
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →If a building in Stourport-on-Severn needs fire-resistant glass, the starting point is the rating its fire strategy requires. We confirm that, survey the openings and quote a tested system to suit.
Tell us what you need. We reply with next steps and a guide price.
We supply and fit fire-resistant glass into new and existing fire-rated frames, matching the glass type, thickness, beads, seals and fixings to the test or assessment evidence for that frame. The glass on its own does not carry a rating; the combination does, so we start every job by identifying the system you have or need.
Insulating fire glass gets thicker and heavier as the rating rises. Large EI 60 and EI 120 panes often need lifting equipment and a frame designed for the load, which we plan before the delivery date.
Glass in doors, side panels and low-level positions has to meet impact safety rules as well as the fire rating. Most modern fire glass carries an impact classification; old wired glass usually does not.
The fire strategy or building control drawings set the rating for each element. Integrity-only glass is cheaper and thinner, but its use on escape routes is restricted; insulating glass carries far fewer restrictions because people can pass it safely during a fire.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Whether the building is in central Stourport-on-Severn or the wider DY13, DY11 districts, we can survey and quote. We also cover Kidderminster, Droitwich, Bromsgrove. Stourport-on-Severn is about 17 km from Worcester, the largest town in our Worcestershire coverage.
You receive the classification references, glass marks and installation photographs for your fire safety records.
Designs follow the building and fire safety rules that apply in England, not a one-size-fits-all approach.
We can phase work in Stourport-on-Severn around residents, staff or pupils, with out-of-hours options.
We can survey and quote for care homes, hotels and other building types in Stourport-on-Severn.
Often, yes. We read the marks on the existing panes and check them against the frame evidence. Where the original product is discontinued we look for an alternative covered by the same evidence or a formal assessment.
Ordinary toughened safety glass is not. It can shatter early in a fire. Fire-resistant integrity glass is specially processed or formulated and only gains a rating when fitted in a tested frame and glazing system.
Building work in Stourport-on-Severn follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Survey timing in Stourport-on-Severn depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →E and EW glass where flames and hot gases must be stopped.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
We measure each opening in Stourport-on-Severn and check what the existing frames can accept.
You receive a written quote naming the tested system and classification.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.