Fire-Resistant Glass for Wiltshire buildings
We take fire-resistant glass enquiries from across Wiltshire, with surveys arranged in Swindon, Salisbury, Trowbridge, Chippenham and the surrounding towns.
Quote for Wiltshire
Tell us what you need. We reply with next steps and a guide price.
Fire-Resistant Glass by town in Wiltshire
Across Wiltshire we can survey in Swindon, Salisbury, Trowbridge, Chippenham and every district in the SN, SP, BA postcode areas.
Fire-Resistant Glass: an overview for Wiltshire
Fire-resistant glass is glazing that has been tested, as part of a complete glazed system, to hold back fire for a set time. It is classified by what it stops: E (integrity) keeps flames and hot gases on the fire side, EW also limits the heat radiated through the glass, and EI (integrity and insulation) also limits the temperature rise on the protected side, so people can pass it more safely.
- Glazing beads and fixings to the frame manufacturer's details
- Impact-classified build-ups for critical locations
- Insulating (EI) intumescent-interlayer and gel-filled glass
What to check before ordering in Wiltshire
Can any fire glass go in any fire-rated frame?
No. A frame is only rated with the glass types and pane sizes it was tested or assessed with. We check the frame's evidence before quoting, and if the existing frame is unknown we say so and price the options.
Which classification do you actually need?
The fire strategy or building control drawings set the rating for each element. Integrity-only glass is cheaper and thinner, but its use on escape routes is restricted; insulating glass carries far fewer restrictions because people can pass it safely during a fire.
Weight and handling
Insulating fire glass gets thicker and heavier as the rating rises. Large EI 60 and EI 120 panes often need lifting equipment and a frame designed for the load, which we plan before the delivery date.
England rules for fire glazing
England Which rules apply?
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
FAQs for Wiltshire
Can you match glass that is already installed?
Often, yes. We read the marks on the existing panes and check them against the frame evidence. Where the original product is discontinued we look for an alternative covered by the same evidence or a formal assessment.
Is toughened glass fire-resistant?
Ordinary toughened safety glass is not. It can shatter early in a fire. Fire-resistant integrity glass is specially processed or formulated and only gains a rating when fitted in a tested frame and glazing system.
What is the difference between E, EW and EI fire glass?
E is integrity only: it stops flames and hot gases passing for the rated time. EW adds a limit on radiated heat through the glass. EI adds insulation, keeping the unexposed face below set temperature rises so people can pass it safely. The number after the letters is the time in minutes.
Do you cover all of Wiltshire?
Yes. We take enquiries from across Wiltshire, including Swindon and Salisbury, Trowbridge, Chippenham, and arrange surveys to suit your programme.
Related services in Wiltshire
From enquiry to handover in Wiltshire
Tell us what you have
Send drawings, a fire risk assessment action or photos of the glass marks.
Measure and check
We measure each opening in Wiltshire and check what the existing frames can accept.
Written quote
You receive a written quote naming the tested system and classification.
Install and hand over
Installation to the system details, then a handover pack with photographs and evidence.