Insulated Fire Glass (EI)
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →When a fire strategy, inspection report or building control comment in Shrewsbury calls for glazing tested to resist fire, our fire-resistant glass service covers survey, supply and installation.
Tell us what you need. We reply with next steps and a guide price.
We supply and fit fire-resistant glass into new and existing fire-rated frames, matching the glass type, thickness, beads, seals and fixings to the test or assessment evidence for that frame. The glass on its own does not carry a rating; the combination does, so we start every job by identifying the system you have or need.
Survey visits can be arranged anywhere in Shrewsbury, including the SY1, SY2, SY3 districts, and in nearby Wellington, Telford, Rhosllannerchrugog. Shrewsbury lies roughly 21 km from Telford, within our Shropshire coverage.
Insulating fire glass gets thicker and heavier as the rating rises. Large EI 60 and EI 120 panes often need lifting equipment and a frame designed for the load, which we plan before the delivery date.
No. A frame is only rated with the glass types and pane sizes it was tested or assessed with. We check the frame's evidence before quoting, and if the existing frame is unknown we say so and price the options.
Glass in doors, side panels and low-level positions has to meet impact safety rules as well as the fire rating. Most modern fire glass carries an impact classification; old wired glass usually does not.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
If an existing frame in a Shrewsbury building has no traceable evidence, we say so and price the options rather than guess.
We can phase work in Shrewsbury around residents, staff or pupils, with out-of-hours options.
You receive the classification references, glass marks and installation photographs for your fire safety records.
Fire-resistant glass applies to many building types in Shrewsbury, including schools and colleges and industrial units.
E is integrity only: it stops flames and hot gases passing for the rated time. EW adds a limit on radiated heat through the glass. EI adds insulation, keeping the unexposed face below set temperature rises so people can pass it safely. The number after the letters is the time in minutes.
Often, yes. We read the marks on the existing panes and check them against the frame evidence. Where the original product is discontinued we look for an alternative covered by the same evidence or a formal assessment.
Building work in Shrewsbury follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Survey timing in Shrewsbury depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →E and EW glass where flames and hot gases must be stopped.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
A survey in Shrewsbury confirms sizes, access, existing evidence and fixing conditions.
Your quote lists each item with its classification and the evidence it relies on.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.