Insulated Fire Glass (EI)
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →From the BN2 district outwards, we arrange fire-resistant glass for buildings across Brighton, matching glass, frames and seals to tested evidence rather than guesswork.
Tell us what you need. We reply with next steps and a guide price.
Fire-resistant glass is glazing that has been tested, as part of a complete glazed system, to hold back fire for a set time. It is classified by what it stops: E (integrity) keeps flames and hot gases on the fire side, EW also limits the heat radiated through the glass, and EI (integrity and insulation) also limits the temperature rise on the protected side, so people can pass it more safely.
Most fire glass is permanently marked with its product and classification. We record the marks, pane sizes and evidence references on handover so whoever is responsible for fire safety can show what is installed.
The fire strategy or building control drawings set the rating for each element. Integrity-only glass is cheaper and thinner, but its use on escape routes is restricted; insulating glass carries far fewer restrictions because people can pass it safely during a fire.
Many insulating fire glasses use interlayers that need protecting from UV and moisture, so external positions need a product approved for exterior use, with the right edge seal and glazing system.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
Survey visits can be arranged anywhere in Brighton, including the BN2, BN88, BN50, BN3, BN1 districts, and in nearby Hove, Portslade, Burgess Hill. Brighton is the largest town in our East Sussex coverage.
If an existing frame in a Brighton building has no traceable evidence, we say so and price the options rather than guess.
After survey you get a fixed written quote for the agreed scope, so Brighton budgets are not open-ended.
Every quote in Brighton identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.
We can survey and quote for hotels, schools and colleges and other building types in Brighton.
Our service is supply and installation, because the rating depends on how the glass is fitted. For trade buyers we can quote supply of cut-to-size panes with the matching glazing materials on request.
Integrity glass can be similar in thickness to standard glass. Insulating glass is laminated from several layers, so it gets markedly thicker and heavier as the rating increases from EI 30 to EI 120.
Building work in Brighton follows the Building Regulations 2010 and Approved Document B, and occupied buildings are covered by the Regulatory Reform (Fire Safety) Order 2005.
Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.
EI 30 to EI 120 glass that blocks heat as well as flames.
Learn more →E and EW glass where flames and hot gases must be stopped.
Learn more →Cracked or broken fire glass replaced to the original specification.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
We measure each opening in Brighton and check what the existing frames can accept.
We set out the system, glass, evidence and programme, with a fixed price.
Work is completed to the manufacturer's details and documented for your records.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.