Tested fire-rated glazing systemsSurvey, supply and install UK-wideEvidence pack on handover
0800 088 6248
FIRE-GLAZING
Norfolk · IP24

Timber Fire-Rated Screens — Thetford and IP24

Looking for timber fire-rated screens in Thetford? We survey, supply and install tested fire-rated glazing for industrial units, blocks of flats and other buildings in and around Thetford, including the IP24 postcode district.

E 30 – EI 60IP24England

Quote for Thetford

Tell us what you need. We reply with next steps and a guide price.

What's involved with timber fire-rated screens in Thetford

Timber fire-rated screens are glazed partitions made with hardwood frames, glazing beads and intumescent seals that have been tested together to resist fire. They are common in schools, healthcare, heritage buildings and residential blocks where a warmer finish is wanted.

  • Painted, stained or lacquered finishes
  • Over-panels, side panels and borrowed lights
  • Fire-stopping to the structure
  • Hardwood frames to tested sections and densities

What every Thetford quote includes

Rated systems, not just rated glass

Every quote in Thetford identifies the tested system: frame, glass, beads, seals and fixings, within its pane-size limits.

Work around occupied buildings

We can phase work in Thetford around residents, staff or pupils, with out-of-hours options.

Fixed written quotes

After survey you get a fixed written quote for the agreed scope, so Thetford budgets are not open-ended.

What to check before ordering timber fire-rated screens in Thetford

Finishing

Paint and stain are fine on the timber, but intumescent seals must stay clear of paint. We mask them during finishing.

Beads are part of the rating

Bead profile, height and fixing type and spacing are all taken from the test. Short-cutting the fixings is a common reason screens fail inspection.

Species and density count

Timber screens are tested with specific species and minimum densities. Softwood substitutions or thinner sections can fall outside the evidence.

Where we work around Thetford

Coverage around Thetford includes the IP24 districts and nearby Bury St Edmunds, Newmarket, Stowmarket. Norwich, around 44 km from Thetford, is the largest town in the same coverage area.

Which rules apply to timber fire-rated screens in Thetford?

England Which rules apply?

Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.

Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.

Sectors we cover in Thetford

Timber fire-rated screens applies to many building types in Thetford, including industrial units and blocks of flats.

Questions about timber fire-rated screens in Thetford

Can timber screens be painted?

Yes. The timber can be painted, stained or lacquered. Intumescent seals are kept clear of paint.

Can timber screens be fire-rated?

Yes. Hardwood screens are tested to 30 and 60 minutes in many configurations, with the right glass, beads and seals.

How quickly can you survey in Thetford?

Survey timing in Thetford depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.

Do you work on occupied buildings in Thetford?

Yes. We plan phasing, out-of-hours work and temporary protection so the building can stay in use where the fire strategy allows.

Related

Related services in Thetford

E 30 – EI 120

Fire-Rated Glazed Screens

Internal glazed screens that keep compartments and corridors protected.

Learn more →
to door rating

Fire Door Vision Panels

Replacement and new vision panels fitted to the door's evidence.

Learn more →
Process

What happens next

Share the details

Send the fire strategy extract, inspection report or a few photos of the openings.

Site visit

A survey in Thetford confirms sizes, access, existing evidence and fixing conditions.

Quote and evidence

Your quote lists each item with its classification and the evidence it relies on.

Fit and record

We install, photograph seals and fixings before closing up, and hand over the schedule.

Need fire-rated glazing checked, replaced or installed?

Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.

Call freeGet a quote