Fanlights, Side Panels & Borrowed Lights
Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →If a building in Carlisle needs timber fire-rated screens, the starting point is the rating its fire strategy requires. We confirm that, survey the openings and quote a tested system to suit.
Tell us what you need. We reply with next steps and a guide price.
The rating depends on the timber species and density, frame sections, bead profiles, fixings and the glazing seals used in the test. We build timber screens to a tested specification, or to a formal assessment, and finish them without compromising the intumescent details.
Timber frames need dry conditions on site and acclimatisation before glazing to avoid movement around the glass.
Timber screens are tested with specific species and minimum densities. Softwood substitutions or thinner sections can fall outside the evidence.
Paint and stain are fine on the timber, but intumescent seals must stay clear of paint. We mask them during finishing.
Coverage around Carlisle includes the CA1, CA3, CA2 districts and nearby Dumfries, Workington, Whitehaven. Carlisle is the main town we cover in Cumbria.
If an existing frame in a Carlisle building has no traceable evidence, we say so and price the options rather than guess.
After survey you get a fixed written quote for the agreed scope, so Carlisle budgets are not open-ended.
We can phase work in Carlisle around residents, staff or pupils, with out-of-hours options.
Building work in England is covered by the Building Regulations 2010, with fire safety guidance in Approved Document B and impact safety guidance for glazing in Approved Document K.
Once a building is in use, the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to maintain fire safety measures, including fire-resisting glazing. The Fire Safety (England) Regulations 2022 add duties for multi-occupied residential buildings, including fire door checks in buildings over 11 metres.
In higher-risk buildings, broadly 18 metres or seven storeys with two or more homes, the Building Safety Regulator is the building control authority. England is also phasing out BS 476 references from Approved Document B, with the remaining fire-resistance references due to go in September 2029.
We can survey and quote for schools and colleges, care homes and other building types in Carlisle.
Dense hardwoods are typical; the exact species depends on the tested specification. We confirm species and density on the drawings.
Yes. Hardwood screens are tested to 30 and 60 minutes in many configurations, with the right glass, beads and seals.
Survey timing in Carlisle depends on access, the size of the building and how urgent the defect is. Tell us your deadline when you enquire and we will confirm a date before you commit.
Yes. We survey and install in Carlisle and across Cumbria, including the CA1 district and nearby Dumfries.
Glazed over-panels, side lights and borrowed lights around fire doors.
Learn more →Doorsets with large glazed panels, tested as complete units.
Learn more →Internal glazed screens that keep compartments and corridors protected.
Learn more →Replacement and new vision panels fitted to the door's evidence.
Learn more →Send the fire strategy extract, inspection report or a few photos of the openings.
A survey in Carlisle confirms sizes, access, existing evidence and fixing conditions.
Your quote lists each item with its classification and the evidence it relies on.
We install, photograph seals and fixings before closing up, and hand over the schedule.
Send sizes, photos of any glass marks or your inspection report and we will come back with the right tested system.